Verona High School

Verona Public Schools

Emergency Generator and Fire Alarm System

As District Architect/Engineer for the Verona School District, EI Associates designed a new natural gas emergency generator installation and fire alarm system at Verona High School. The generator was sized and designed to handle emergency power, lighting and life safety equipment during a power outage. The new fire alarm system is fully addressable and includes new detectors, annunciator panel, wiring and devices.

EI provided all design phase services as well as bidding assistance and construction administration for this project.