EI Associates designed and constructed a new steam boiler facility and a loading dock addition for TEVA Pharmaceuticals’ main U.S. production facility. The new facility replaced three 25-year old boilers with two new 250,000 lb. boilers and expanded steam capacity by 200 lb. The project increased boiler efficiency by changing from #6 to #2 oil and reduced total boiler room space. A location for the new boilers was found in the existing loading dock. The loading dock was also expanded by adding a bay to the building to maintain the same flexibility for material handling.
New Steam Boiler Facility and Loading Dock Addition
TEVA Pharmaceuticals
![](https://www.eiassoc.com/wp-content/uploads/2021/07/New-Steam-Boiler-Facility-01-800x530.jpg)
![](https://www.eiassoc.com/wp-content/uploads/2021/07/New-Steam-Boiler-Facility-02-800x530.jpg)
![](https://www.eiassoc.com/wp-content/uploads/2021/07/New-Steam-Boiler-Facility-03-800x530.jpg)