XP Area Process Improvements

Mallinckrodt Baker Inc.

Phillipsburg, NJ


EI Associates recently completed a special assignment to prepare isometric piping drawings for fabrication at Mallinckrodt Baker’s Phillipsburg, NJ facility.  The project involved preparing detailed piping isometric drawings for pre-fabrication of connections to 30 vessels and 53 pipe headers.  Further project requirements comprised:

Project Requirements:

1. Scope Involved Installation Of New Vapor Recovery System

2. Project Comprised Two Multi-story Buildings (Bldgs 98 & 101)

3. Detailed Piping Fabrication Connection Drawings:

a) Connections To 30 Vessels And 53 Pipe Headers

b) 250 Iso’s

4. Class I, Div. I Rated Area

a) Required Minimum Of Field Welds – Target Was Zero Field Welds

5. 1/8” Dimensional Accuracy

6. Project Schedule: Engineering Complete In 3 Months